Texas Gigapark

A 1,472-acre campus for the AI era

Strategically located between Austin and San Antonio, Texas Gigapark is a shovel-ready, master-planned campus with multiple independent paths to energized capacity.

REQUEST PROJECT INFORMATION →
Texas Gigapark assembled tract map with 2.6 GW power plant site, 1,472 acres, and site control legend

Three independent
routes to power.

Texas Gigapark gives hyperscale and AI operators flexibility and control with three viable power pathways. Use one or combine them.

I

Islanded

Fully self-generated, no ERCOT interconnection, no queue dependency. Schedule controlled entirely on site.

B

Behind the meter

Secured gas supply path under a private use network. Load ramp starting around 800 MW and scaling to 2.6 GW.

G

Grid

450 MW ERCOT request submitted, with anticipated inclusion in Batch One (confirmation expected 2027) through Bluebonnet and LCRA. Available if you want it, not required.

Minimal water
draw.

Heavy water consumption in data centers is a hallmark of legacy evaporative cooling. Texas Gigapark is planned around closed-loop cooling instead.

0

No Ongoing Draw

Closed-loop cooling recirculates water rather than evaporating it, keeping ongoing municipal draw close to zero.

M

Contingency Allocation

300,000 GPD requested from the Maxwell CCN as a backup allocation, not the campus's primary water source.

W

Regional Wastewater

On-site wastewater permit secured; the investment also benefits the surrounding community.

Austin San Antonio corridor

Prime Location

35 miles from Austin, 45 miles from San Antonio, on the SH 130 corridor with regional airport and freight rail access.

VIEW LOCATION →
Texas Gigapark acreage

1,472 Contiguous Acres

Owned across three ownership groups. No zoning, within the City of Martindale ETJ. Under 5% in FEMA Zone A/AE. Prairie, flat to gently rolling.

VIEW SITE →
Infrastructure

Infrastructure Ready

Closed-loop cooling limits water draw, on-site wastewater permit secured, fiber study complete for Tier 4 support, and equipment supply chain paths in place.

VIEW INFRASTRUCTURE →
SH 130 corridor

Built for Scale

A supportive county, minimal nearby residential, major infrastructure access, and a pathway to 2.6 GW.

LEARN MORE →

Phased
delivery.

1,472 acres are assembled today. The master plan is sized to 1,600 acres, with expansion capability to 2,100.

27

2027 — Construction Start

Power plant, gas pipeline, and data center construction begin.

29

2029 — Phase 1 Online

Initial 800 MW commissioned. First tenant capacity available.

31

2031 — Full Build

Expansion to 2.6 GW commissioned. Campus at full utilization.

Built on
trained labor.

An on-campus technical training center covers every data center role, from skilled trades through operations, management, and engineering, drawing workforce from both the Austin and San Antonio labor markets. NCCER and Uptime Institute accreditations are in progress.

C

Peak Construction

1,500–3,000 workers during build-out.

$

$169,891

Average annual pay for data center operations roles, Austin market, April 2026.

P

367 → 865

Permanent positions from Phase 1 to full build, across the data center, power plant, and training center.

Incentives
available.

State and local programs applicable to the campus, coordinated with Caldwell County.

S

State of Texas

Job-creation abatements, an energy equipment sales tax exemption, technology grants, and workforce training support through JETI, the Enterprise Zone Program, and the Texas Enterprise Fund.

L

Caldwell County

A Chapter 381 economic development agreement and support for a tax increment reinvestment zone covering campus infrastructure.

E

EPRI DCFlex

Texas Gigapark participates in EPRI's DCFlex program for flexible, grid-supportive data center load.

A next-generation infrastructure opportunity in Texas.